We see that you have javascript disabled. Please enable javascript and refresh the page to continue reading local news. If you feel you have received this message in error, please contact the customer support team at 1-833-248-7801.

ADVERTISEMENT

ADVERTISEMENT

County Road 10 at Acorn Lake closed Tuesday for Heartland Trail bridge work

Cranes will be used to lift the structures and set them into place on the newly constructed bridge piers and abutments.

heartland bridge.JPG
The supports for the Heartland Trail bridge over Becker County Road 10 are in place near Acorn Lake. (Nathan Bowe, Tribune. June 19, 2021 photo)
We are part of The Trust Project.

Becker County Road 10, which leads to Frazee from Highway 10 at Acorn Lake, will be closed to traffic on Tuesday, Aug. 31 starting at 9 a.m. for Heartland Trail bridge construction.

The closure will last for most of the day, with the roadway reopening to traffic that evening, according to the Becker County Highway Department. The reason for the closure is to allow construction crews to install the steel structures for the new Heartland Trail bridge over County Road 10.

Cranes will be used to lift the structures and set them into place on the newly constructed bridge piers and abutments.

Access between County Road 10 and Highway 10 will be by way of Acorn Lake Road. Detour signs will be posted.

What to read next
Thomas Shephard's favorite part of harvest is the people he does it alongside as there are a lot of jobs to do and the people who he works with are the ones who get it done.